Project Category: Power & Energy
Technical Support for GeneraPR’s (previously PREPA) Turbine Reconditioning Project
The GENERAPR has undertaken a significant project to recondition its steam turbine generation fleet, located at San Juan (Puerto Nuevo Power Station), Toa Baja (Palo Seco Power Station), Salinas (Aguirre Power Station) and Guayanilla (South Coast Power Station). CPM is supporting GENERAPR providing project controls,...
Continue ReadingInspections and Assessments of Power Distribution System
Completed Date: 2020 Puerto Rico Electric Power Authority CPM was selected by the Puerto Rico Electric Power Authority to conduct inspections and assessments of the works performed by the contractor responsible for restorations of the electrical distribution system. Additional Highlights: CPM conducted assessments and inspections...
Continue ReadingCoating Services – Oil Pipeline Energy Plant
Completed Date: 2021 Puerto Rico Electric & Power Authority CPM was selected to provide coating application and coating management services as part of the exterior rehabilitation of certain oil pipelines for the Aguirre Plant, one of the largest energy generation plants in Puerto Rico. Additional...
Continue ReadingCoating Services – DEMI 1 Combined Cycle Tank
Completed Date: 2021 Puerto Rico Electric & Power Authority CPM provided support during the coating application phase and coating management services for the inner rehabilitation of the DEMI 1 Combined Cycle tank located in the Aguirre Plant, one of the largest energy generation plants in...
Continue ReadingAerial Inspections – Energy Generation Plants
Completed Date: 2020 Puerto Rico Electric & Power Authority In 2020, CPM was contracted by the Puerto Rico Electric and Power Authority to conduct aerial inspections of its Costa Sur generation plant. Additional Highlights: The objective of the aerial inspection was to provide inspection of...
Continue ReadingAssessments of Electric Substations
Completed Date: 2020 Puerto Rico Electric and Power Authority In 2019, the Puerto Rico Electric and Power Authority selected CPM to conduct Damage Assessments and cost estimates of repair of a series of electric substations throughout Puerto Rico. These assessments were part of the 2017...
Continue ReadingP3 Procurement Services – Electric T&D P3 Project
Completed Date: 2020 Puerto Rico Public-Private Partnerships Authority In 2018, CPM was selected to provide P3 Procurement Services for an Operation and Maintenance contract of the transmission and distribution (“T&D”) system of the Puerto Rico Electric Power Authority (“PREPA”). The project reached successful commercial and...
Continue ReadingInspections & Assessments – Electric Substation Components
Completed Date: 2021 Puerto Rico Electric Power Authority In 2020, CPM was selected by the Puerto Rico Electric and Power Authority to conduct inspections and assessments of electric substation sites including their fences, gravel and ground conditions. Additional Highlights: Post-hurricane damages required reliable inspection and...
Continue ReadingCondition Assessments – Streetlights Infrastructure
Completed Date: On-going Puerto Rico Electric and Power Authority CPM was selected by the Puerto Rico Electric and Power Authority to provide damage assessments and inspections for numerous streetlights and their corresponding poles. The 2017 hurricane season provoked widespread damage to electric transmission and distribution infrastructure....
Continue ReadingCopyright © | 1991 - 2024 | All Rights Reserved